AI and Salesforce for Manufacturing

Manufacturing. Quote, order and service split across CPQ, ERP and a queue.

Makers lose the order between CPQ, ERP, and a service queue. We implement Manufacturing Cloud or Sales and Service around quote-to-cash and the installed base, with integration errors visible.

Founded 2022 · Founder in the Salesforce MVP Hall of Fame · Dubai HQ · Kochi studio

The week

What is actually stuck.

The honest no: if the work is a software factory with a named delivery date, we are the wrong partner.

Examples

Where the week gets stuck.

  • Example

    Sales operations manager at a building-materials maker in Sharjah

    Today: A rep promises a delivery date the plant cannot hit, because capacity lives in the ERP.

    After: The quote reads the ERP’s date before it goes out. The ERP stays the source.

    MuleSoft integration
  • Example

    Service manager at an equipment maker in Houston

    Today: A technician arrives without knowing what was installed last year.

    After: The installed asset and its service history sit on the account the technician opens.

    Service Cloud
  • Example

    Finance lead at a packaging maker in Jebel Ali

    Today: A failed integration drops orders silently, and nobody notices until month end.

    After: Integration errors land in a queue with an owner the same day.

    For CFOs
Examples typical of the sector, not client case studies.

The desk

Where the record has to hold.

A sales operations planner on a phone with a printed schedule in an office overlooking a factory floor.

Illustration

Above the floor: the quote should know what the plant can ship.

The work

What we put in the org.

  1. 01MuleSoft or an API only when it earns the seat
  2. 02A quieter org if technical debt is the real problem
  3. 03Rescue if the last partner left a half-built Manufacturing Cloud

The first weeks

From the brief to one process in production.

  1. Day 1

    Send the situation

    One brief. Someone who can say no replies within 24 hours.

  2. Week 1

    We read your org

    Customer and SKU matching with the ERP, and every integration that can fail quietly.

  3. End of the read

    A written assessment

    What to fix first, or the reason this is not the work.

  4. Build week 1

    The first named piece

    Quote-to-order or installed-base service, with integration errors visible.

  5. Go-live

    One process in production

    A person on the exceptions. Then we stay.

The assessment is free: a short read of the org and a written note. If you go ahead, the first build week is a fixed AED/SAR 14,900 (about USD 4,050), credited in full when you sign the build within 60 days.

What changed · Regional manufacturer

The quote matches what ERP will accept.

Regional manufacturer case study

Apps we host

Software we run for you.

Apps we brand, host in the region and run, with prices on each page in AED and SAR.

Mindcat Dispatch live map of Dubai with customer pins and a list of eight online drivers with their vans.
Real screen, sample data

Mindcat Dispatch

Water, gas cylinder and FMCG distributors in the UAE and Saudi Arabia. The 06:00 route is planned by district, the driver logs bottles, cash or coupons at each villa gate, and each cylinder is tied to a licensed van and driver.

Order boardLive mapCash per driver
Mindcat Desk ticketing system: open tickets for a Dubai facilities team and a Riyadh IT desk, in English and Arabic, sorted by SLA escalation time.
Real screen, sample data

Mindcat Desk

Spare-parts, equipment and facilities suppliers in Dubai Investments Park and Al Quoz with SLA contracts. A client’s email or the site’s phone call starts the contract clock, and the month-end SLA report comes from the system, not Excel.

SLA clocksEmail, phone, portalArabic help centre
Mindcat Accounts ZATCA Integration Log for a sample Riyadh distributor: eleven invoices cleared, one walk-in sale reported and one credit note rejected.
Real screen, sample data

Mindcat Accounts

Building materials, FMCG and spare parts distributors in Riyadh’s Second Industrial City, Dammam and Jebel Ali. Invoices cleared with ZATCA before wave 25’s 1 February 2027 deadline, the delivery note and stock moving with the invoice, and credit limits that stop the next truck for a contractor 90 days late.

ZATCA clearanceUAE and Saudi VATStock and POS

The brief · two taps and an email

We work in manufacturing and logistics and right now, leads go cold before anyone replies.

Industry
Problem

Brief: Manufacturing. Quote, order and service split across systems. An agent on a named process. A reviewer on the exceptions.